SKU:BodyK109
Bodyshape Right S Curve Campervan Mattress - King
Bodyshape Right S Curve Campervan Mattress - King
Couldn't load pickup availability
Campervan Mattress Experts Since 1982
Built to Last
Up to 10-year guarantee - quality materials last decades, not months
Handcrafted in Britain
Made in our UK workshop - not mass-produced overseas
Free UK Delivery
Complimentary delivery - upgrading should be effortless
Perfect Custom Fit
Made specifically for your campervan - no gaps or poor fitting

Bodyshapeโข Mattress
Premium Vascoโข50 memory foam for personalised pressure relief and superior motion isolation
- 3 firmness levels: Medium, Firm Orthopaedic, Hard
- Depths from 15โ25 cm
- 5-year guarantee
- TENCELยฎ zip-off washable cover
- Premium Vascoโข50 memory foam
- Triple-layer construction
- Lightweight design
- Excellent motion isolation for couples
Triple-Layer Construction
-
TENCELยฎ Zip-Off Cover
Superior moisture-wicking and temperature regulation. Easy to remove and machine wash.
-
Vascoโข50 Memory Foam Top Layer
Moulds to your body shape for personalised pressure relief and motion isolation.
-
Adaptive Support Layer
Responds to movement whilst maintaining proper spinal alignment. Bridges the comfort layer with the foundation.
-
Premium Foundation Layer
Provides stability and durability in a lightweight construction.
Why Choose Bodyshapeโข?
The Bodyshapeโข features Vascoโข50 memory foam that moulds to your body shape for targeted pressure relief โ a significant step up from the budget memory foams used by many competitors.
Its triple-layer construction delivers excellent motion isolation, making it ideal for couples, whilst adapting to your individual sleep needs.
Ideal for:
- Couples wanting minimal sleep disturbance
- Those with pressure points needing targeted relief
- Side sleepers seeking body-contouring support
- Anyone requiring orthopaedic support with comfort
Firmness & Depth Options
Firmness Levels
Medium
Personalised contouring with balanced support
Firm Orthopaedic
Enhanced spinal alignment and therapeutic support
Hard
Maximum support with targeted pressure relief
Available Depths
Compact comfort for tighter spaces. Supports up to 15 stone (95 kg).
Optimal balance of contouring and support. Supports up to 20 stone (127 kg).
Maximum luxury and pressure relief. Supports up to 25 stone (159 kg).
All depths available in Medium, Firm Orthopaedic, and Hard. For weights above 25 stone, please contact us for bespoke options.
Care & Maintenance
Mattress
- No-flip design โ one-sided use with a marked sleeping surface
- Rotate head-to-foot periodically for even wear
- Allow ventilation; use a mattress protector
- No special maintenance required for the foam layers
TENCELยฎ Cover
- Machine wash at 30 ยฐC on a gentle cycle
- Use mild liquid detergent โ no bleach
- Air dry only
- Iron on low if needed
- Wash every 1โ2 months
Measuring Guide
We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.
Delivery
- Free delivery to most addresses in England, Scotland, and Wales
- Rolled and vacuum-packed in a 158 ร 39 ร 39 cm box for easy handling
- Lead time typically 7โ14 days depending on demand and production capacity
Specific mattress weights are available on request.
Frequently Asked Questions
- How does Vascoโข50 memory foam work?
- It uses your body heat to mould to your shape, providing personalised support that standard budget foams cannot match.
- How good is the motion isolation?
- Excellent โ the Vascoโข50 construction absorbs movement so your partner won't disturb you.
- How long does a rolled mattress take to expand?
- 2โ4 hours for basic expansion; allow 24โ48 hours for the foam to fully activate.
- What's included?
- The mattress with TENCELยฎ zip-off cover, care instructions, and a 5-year guarantee.
- Is the Firm Orthopaedic option suitable for everyday use?
- Absolutely โ it's designed for therapeutic support whilst remaining comfortable for all sleeping positions.