SKU:ComfiS105
Comfisan Left S Curve Campervan Mattress - Single
Comfisan Left S Curve Campervan Mattress - Single
Couldn't load pickup availability
Campervan Mattress Experts Since 1982
Built to Last
Up to 10-year guarantee - quality materials last decades, not months
Handcrafted in Britain
Made in our UK workshop - not mass-produced overseas
Free UK Delivery
Complimentary delivery - upgrading should be effortless
Perfect Custom Fit
Made specifically for your campervan - no gaps or poor fitting

Comfisanโข Mattress
Engineered orthopaedic support with Laytecโข responsive comfort and express delivery
- 3 firmness levels: Medium-firm, Firm Orthopaedic, Hard
- Depths from 15โ25 cm
- 5-year guarantee
- TENCELยฎ moisture-wicking fixed cover
- Laytecโข comfort layer โ rebounds faster than memory foam
- Multi-layer orthopaedic construction
- Lightweight, no-flip design
- Express delivery: 7โ10 working days
Multi-Layer Construction
-
TENCELยฎ Fixed Cover
Naturally hypoallergenic with excellent moisture-wicking and temperature regulation.
-
Laytecโข Pressure-Relieving Top Layer
Responsive comfort that conforms to your body whilst maintaining spinal alignment. Rebounds faster than memory foam.
-
Premium Foundation Layer
Engineered for orthopaedic stability and long-lasting support.
Why Choose Comfisanโข?
The Comfisanโข combines engineered orthopaedic support with a Laytecโข comfort layer that rebounds and recovers faster than memory foam, giving you responsive pressure relief without the slow-sink feeling.
Its multi-layer construction delivers excellent support whilst remaining lightweight and easy to handle, with express delivery in just 7โ10 working days.
Ideal for:
- Those seeking orthopaedic support for back or joint concerns
- Hot sleepers needing temperature regulation
- Anyone wanting responsive comfort that doesn't sink
- Those needing a mattress quickly with express delivery
Firmness & Depth Options
Firmness Levels
Medium-firm
Balanced orthopaedic support with gentle pressure relief
Firm Orthopaedic
Enhanced support for optimal spinal alignment
Hard
Maximum orthopaedic support for therapeutic sleep
Available Depths
Compact orthopaedic support. Supports up to 15 stone (95 kg).
Optimal balance of comfort and support. Supports up to 20 stone (127 kg).
Maximum therapeutic comfort. Supports up to 25 stone (159 kg).
All depths available in Medium-firm, Firm Orthopaedic, and Hard. For weights above 25 stone, please contact us for bespoke options.
Care & Maintenance
Mattress
- No-flip design โ one-sided use with a marked sleeping surface
- Rotate head-to-foot periodically for even wear
- Allow ventilation; use a mattress protector
- Hypoallergenic construction resists dust mites naturally
TENCELยฎ Fixed Cover
- Spot clean with mild detergent and water
- Allow to air dry completely
- Use a mattress protector for added care
- Professional cleaning if required
Measuring Guide
We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.
Delivery
- Free delivery to most addresses in England, Scotland, and Wales
- Rolled & Boxed: vacuum-sealed in a 158 ร 60 ร 60 cm carton
- Full Size: delivered ready to use with no compression
- Express delivery 7โ10 working days, but usually ships quicker
Specific mattress weights are available on request.
Frequently Asked Questions
- Why does the Comfisanโข have a fixed cover?
- Fixed covers provide seamless aesthetics and enhanced durability.
- How long does a rolled mattress take to expand?
- Around 60 minutes to a few hours for full expansion.
- What's included?
- The mattress with TENCELยฎ fixed cover, care instructions, and a 5-year guarantee.
- Is it suitable for adjustable beds?
- Yes โ the flexible construction adapts to adjustable base positions whilst maintaining orthopaedic support.
- How fast is express delivery?
- 7โ10 working days including production and shipping, but it usually arrives sooner.