SKU:CoolpS109
Coolplus Right S Curve Campervan Mattress - Single
Coolplus Right S Curve Campervan Mattress - Single
Couldn't load pickup availability
Campervan Mattress Experts Since 1982
Built to Last
Up to 10-year guarantee - quality materials last decades, not months
Handcrafted in Britain
Made in our UK workshop - not mass-produced overseas
Free UK Delivery
Complimentary delivery - upgrading should be effortless
Perfect Custom Fit
Made specifically for your campervan - no gaps or poor fitting

Coolplusโข Mattress
ReVoโข cool gel memory foam โ 30x more breathable than standard memory foam, laboratory-proven
- 3 firmness levels: Medium-firm, Firm Orthopaedic, Hard
- Depths from 15โ25 cm
- 5-year guarantee
- Coolplusยฎ zip-off washable cover
- ReVoโข cooling layer โ 30x breathability vs memory foam
- Laytecโข responsive comfort โ rebounds faster than memory foam
- Triple-layer construction
- Lightweight design
Triple-Layer Construction
-
Coolplusยฎ Zip-Off Cover
Superior moisture-wicking with excellent temperature regulation. Easy to remove and machine wash.
-
ReVoโข Cooling Performance Top Layer
Advanced cool gel technology delivers 30x better airflow than memory foam for optimal sleep temperature.
-
Laytecโข Responsive Comfort Middle Layer
Responsive support with faster recovery than memory foam. Spring-like bounce back with proper spinal alignment.
-
Premium Foundation Layer
Enhanced ventilation with exceptional stability and durability in a lightweight construction.
Why Choose Coolplusโข?
The Coolplusโข features ReVoโข cool gel memory foam that delivers 30x more breathability than standard memory foam โ laboratory-proven for optimal sleep temperature. Combined with a Laytecโข responsive comfort layer that rebounds faster than traditional memory foam, it keeps you cool without sacrificing support.
Ideal for:
- Hot sleepers needing superior temperature regulation
- Those who prefer responsive foam that bounces back quickly
- Couples wanting motion isolation with enhanced breathability
- Anyone requiring orthopaedic support with cooling comfort
Firmness & Depth Options
Firmness Levels
Medium-firm
Cooling comfort with responsive support
Firm Orthopaedic
Enhanced support with ReVoโข cooling
Hard
Maximum support with enhanced breathability
Available Depths
Compact cooling and responsive comfort for tighter spaces.
Optimal balance of cooling comfort and adaptive support.
Maximum cooling and responsive technology for premium comfort.
All depths available in Medium-firm, Firm Orthopaedic, and Hard.
Care & Maintenance
Mattress
- No-flip design โ one-sided use with a marked sleeping surface
- Rotate head-to-foot periodically for even wear
- Allow ventilation to maximise the 30x breathability
- Naturally resistant to dust mites
Coolplusยฎ Cover
- Machine wash at 30 ยฐC on a gentle cycle
- Use mild liquid detergent โ no bleach
- Air dry only
- Iron on low if needed
- Wash every 1โ2 months
Measuring Guide
We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.
Delivery
- Free delivery to most addresses in England, Scotland, and Wales
- Rolled and vacuum-packed in a 158 ร 39 ร 39 cm box for easy handling
- Lead time typically 7โ14 days depending on demand and production capacity
Specific mattress weights are available on request.
Frequently Asked Questions
- How do Laytecโข and ReVoโข work together?
- Laytecโข provides responsive bounce back whilst ReVoโข delivers cooling performance โ together they give you support without the heat buildup of standard memory foam.
- What does 30x breathability actually mean?
- Laboratory testing shows the ReVoโข layer allows 30 times more airflow than traditional memory foam, preventing heat buildup and moisture retention.
- How long does a rolled mattress take to expand?
- 1โ2 hours for basic expansion; allow 12โ24 hours for full cooling and responsive performance activation.
- What's included?
- The mattress with Coolplusยฎ zip-off cover, care instructions, and a 5-year guarantee.
- Is the Firm Orthopaedic option suitable for everyday use?
- Absolutely โ it's designed for therapeutic support whilst maintaining cooling comfort for all sleeping positions.