★★★★★ 4.9/5 Rated
🛡️ 10-Year Guarantee
🚚 Free UK Delivery
📍 20,000+ Mattresses Since 1985
Need help? I'm here to help you find the perfect fit. 📞 0121 663 6114 💬 WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 3

SKU:EssentialK183

Essential Left S Curve Campervan Mattress - King

Essential Left S Curve Campervan Mattress - King

Regular price £249.00 GBP
Regular price Sale Price £249.00 GBP
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Choose How to Provide Measurements
📏 Enter Your Measurements Now
  1. Enter precise measurements in your preferred unit
  2. After entering your measurements, scroll down the page and click 'Add to cart' to continue.
Quick measuring reference

Quick measuring reference - click above for detailed guide

Vehicle Details (Optional but helpful)

📧 I'll Email My Measurements After Ordering

No problem — send your measurements after ordering. Email or WhatsApp them to 07769 431 970 with your order number and we'll take care of the rest.

📦 Prefer to Trace Your Mattress? Request a Free Template Kit

We'll post you a free measuring kit — craft paper, marker and prepaid return envelope. Simply trace your mattress shape and post it back.

Arrives within 1–2 working days · Completely free · No payment required

Campervan Mattress Experts Since 1982

Built to Last

Up to 10-year guarantee - quality materials last decades, not months

Handcrafted in Britain

Made in our UK workshop - not mass-produced overseas

Free UK Delivery

Complimentary delivery - upgrading should be effortless

Perfect Custom Fit

Made specifically for your campervan - no gaps or poor fitting

View full details

Essential Comfort Mattress

Quality comfort at an exceptional price — ideal for traders, dealers, and value-conscious buyers

Essential Comfort Mattress
  • 2 firmness levels: Medium-firm (Orthopaedic), Hard
  • 7 depths from 5–25 cm — multiple price points
  • 5-year guarantee
  • Hypoallergenic zip-off washable cover
  • Efficient single-layer construction
  • Lightweight, no-flip design
  • Bulk pricing available for traders

Single-Layer Construction
Essential Comfort single-layer construction diagram
  1. Hypoallergenic Zip-Off Cover

    Breathable and machine washable with good airflow and hypoallergenic protection.

  2. Quality Single-Layer Foam Core

    Consistent support and pressure relief with proper body alignment. Reliable comfort at an exceptional price.

Why Choose Essential Comfort?

The Essential Comfort delivers quality support at an accessible price point. Its efficient single-layer design provides consistent, reliable comfort night after night whilst remaining lightweight and easy to handle.

With seven depth options from 5 cm to 25 cm, there's a price point for every budget — making it particularly popular with traders preparing vehicles for sale and dealers wanting to maximise margins.

Ideal for:

  • Traders and dealers preparing vehicles for resale
  • Budget-conscious buyers seeking quality comfort
  • Occasional or seasonal use
  • Children's beds and spare sleeping areas
  • Anyone needing a specific depth from 5–25 cm
Firmness & Depth Options

Firmness Levels

Medium-firm (Orthopaedic)

Supportive comfort for most sleeping positions

Hard

Maximum support for those preferring extra firmness

Available Depths

5 cm

Ultra-budget option

7.5 cm

Space-saving comfort

10 cm

Occasional use & children

12.5 cm

Enhanced compact comfort

15 cm

Popular choice for traders

20 cm

Great all-round balance

25 cm

Maximum comfort

Weight guidelines by depth

  • 20–25 cm: supports up to 20 stone (127 kg)
  • 12.5–15 cm: supports up to 15 stone (95 kg)
  • 5–10 cm: supports up to 12 stone (76 kg) — suitable for children

For weights above 20 stone we recommend the thicker options.

Care & Maintenance

Mattress

  • No-flip design — one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • Allow ventilation; use a mattress protector
  • Hypoallergenic construction resists dust mites naturally

Zip-Off Cover

  • Machine wash at 30 °C on a gentle cycle
  • Use mild liquid detergent — no bleach
  • Air dry only
  • Iron on low if needed
  • Wash every 1–2 months
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled and vacuum-packed in a 158 × 39 × 39 cm box for easy handling
  • Lead time typically 7–14 days depending on demand and production capacity
Frequently Asked Questions
Do you offer bulk pricing for traders?
Yes — contact us for competitive bulk pricing on multiple mattresses.
Does it come rolled and boxed?
Yes, vacuum-packed in a 158 × 39 × 39 cm box for easy transport and storage.
How long does it take to expand?
Around 60 minutes to a few hours for full expansion.
What guarantee is included?
A 5-year guarantee for peace of mind.
Which depth is most popular for traders?
15 cm offers the best balance of comfort, value, and margin for most resellers.

5-Year GuaranteeQuality assured, built with confidence