SKU:GrandSK131
Grand Crescent™ Left S Curve Luxury Campervan Mattress - Super King
Grand Crescent™ Left S Curve Luxury Campervan Mattress - Super King
Couldn't load pickup availability
Campervan Mattress Experts Since 1982
Built to Last
Up to 10-year guarantee - quality materials last decades, not months
Handcrafted in Britain
Made in our UK workshop - not mass-produced overseas
Free UK Delivery
Complimentary delivery - upgrading should be effortless
Perfect Custom Fit
Made specifically for your campervan - no gaps or poor fitting

Grand Crescent™ Mattress
Premium Vasco™60 memory foam combined with CoolGuard™ ReVo™ cool gel technology — the perfect balance of comfort and cooling
- 2 firmness levels: Medium, Firm Orthopaedic
- Depths of 20 cm and 25 cm
- 5-year guarantee
- CoolGuard™ zip-off cover with ReVo™ cool gel
- Vasco™60 premium pressure-relieving memory foam
- Laytec™ responsive support — rebounds faster than memory foam
- ReVo™ cooling — 30x breathability vs memory foam
- Four-layer construction
- Lightweight design
Four-Layer Construction
-
CoolGuard™ Cover with ReVo™ Cool Gel
Integrated cool gel technology provides instant cooling contact and superior temperature regulation. Zip-off for easy care.
-
Vasco™60 Premium Memory Foam
Premium-grade memory foam delivers exceptional pressure relief and superior body contouring with enhanced motion isolation.
-
Laytec™ Responsive Support Layer
Responsive support with faster recovery than traditional foam. Works with the Vasco™60 layer for optimal comfort balance and spinal alignment.
-
Premium Foundation Layer
Enhanced ventilation with exceptional stability and durability in a lightweight construction.
Why Choose Grand Crescent™?
The Grand Crescent™ brings together premium Vasco™60 memory foam and CoolGuard™ ReVo™ cool gel technology for the perfect balance of contouring comfort and temperature regulation.
Its four-layer construction pairs Laytec™ responsive support with ReVo™ cooling performance, delivering superior pressure relief with 30x better breathability than traditional memory foam — backed by a 5-year guarantee.
Ideal for:
- Those seeking premium memory foam with cooling balance
- Hot sleepers wanting contouring comfort without heat buildup
- Anyone preferring responsive foam that bounces back quickly
- Those requiring orthopaedic support with cooling comfort
Firmness & Depth Options
Firmness Levels
Medium
Premium memory foam comfort with cooling balance
Firm Orthopaedic
Therapeutic support with cooling gel technology
Available Depths
Premium balance of memory foam and cooling technologies.
Maximum comfort with full dual technology benefits.
Both depths available in Medium and Firm Orthopaedic. Suitable for a wide range of body weights.
Care & Maintenance
Mattress
- No-flip design — one-sided use with a marked sleeping surface
- Rotate head-to-foot periodically for even wear
- Allow ventilation to maximise the 30x breathability
CoolGuard™ Cover
- Professional dry clean only
- Do not machine wash or hand wash
- Do not use bleach or harsh chemicals
- Do not tumble dry
Measuring Guide
We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.
Delivery
- Free delivery to most addresses in England, Scotland, and Wales
- Rolled and vacuum-packed in a 158 × 39 × 39 cm box for easy handling
- Lead time typically 7–14 days depending on demand and production capacity
Specific mattress weights are available on request.
Frequently Asked Questions
- How do memory foam and cooling gel work together?
- Vasco™60 memory foam delivers contouring pressure relief whilst the CoolGuard™ ReVo™ cool gel regulates temperature — giving you the comfort of memory foam without the heat buildup.
- What does dual technology performance mean?
- Laytec™ provides responsive bounce back whilst ReVo™ delivers cooling performance — together they complement the Vasco™60 memory foam for a balanced sleep experience.
- How long does a rolled mattress take to expand?
- 1–2 hours for basic expansion; allow 12–24 hours for full cooling and responsive performance activation.
- What's included?
- The mattress with CoolGuard™ zip-off cover, care instructions, and a 5-year guarantee.
- Is the Firm Orthopaedic option suitable for everyday use?
- Absolutely — it's designed for therapeutic support whilst maintaining cooling comfort for all sleeping positions.