SKU:BodySK105
Bodyshape Left S Curve Campervan Mattress - Super King
Couldn't load pickup availability

Our memory-foam campervan mattress. Vascoยฎ foam cradles your shoulders and hips and quietly soaks up movement โ so a partner squeezing past you on a van-width bed never breaks your sleep.
- 3 firmness levels: Medium, Firm, Hard
- Depths from 15โ25 cm
- 5-year guarantee
- Moisture-wicking zip-off cover (TENCELโข)
- Memory foam top layer that moulds to you (Vascoยฎ)
- Bonded 3-layer construction โ not one slab of foam
- Light enough to lift and turn in a pop-top or garage
- When one of you gets up, the other stays asleep
Triple Layer Construction
-
Moisture-wicking zip-off cover (TENCELโข)
Wicks away the condensation that builds up overnight in a shut-up van, keeping the surface dry and fresh. Unzip it and it's machine-washable in seconds โ no dragging the whole mattress out through the sliding door to air it.
-
Memory foam top layer that moulds to you (Vascoยฎ)
Warms to your body and moulds around your pressure points, taking the hardness out of a rock-and-roll bed, a slatted base or a fold-flat seat that was never built for a proper night's sleep.
-
Support layer that stops you sinking too far
Sits under the memory foam to hold your spine in line and stop you sinking too far. It also deadens movement โ which matters when two of you are sleeping shoulder-to-shoulder on a narrow van bed.
-
Firm base layer
A tough, stable base that keeps its shape season after season of packing down and setting up, while staying light enough to lift, turn and stow in a pop-top or garage.
Why Choose Bodyshapeโข?
The bed in a campervan is almost always a compromise โ a rock-and-roll bed, a slatted board or a fold-flat seat, topped with thin foam chosen to hit a price, not to look after your back. Spend a day driving, walking or out on the water and that's exactly when a hard, unsupportive bed catches up with you. The Bodyshapeโข puts that right: a Vascoยฎ memory-foam top layer that contours to your shoulders and hips, over a support core that keeps your spine aligned.
In a van you're sleeping inches apart, and usually one of you is up first. The Bodyshapeโข absorbs that movement rather than passing it across the bed โ so whoever's out for the early surf or the dog walk doesn't drag the other out of a deep sleep.
Ideal for:
- Couples sharing a narrow van bed who don't want to feel every turn
- Anyone waking with sore shoulders, hips or back on a rock-and-roll bed or bench seat
- Side sleepers who want the foam to cushion and contour
- Anyone living in the van who wants firm support without a rock-hard bed
Firmness & Depth Options
Firmness Levels
A soft, contouring feel with balanced support
More support underneath, still cushioned on top
The firmest we make, if you like a really solid bed under you
Available Depths
Compact comfort for pop-tops and lower bed boxes
A balanced depth that suits most rock-and-roll and fixed van beds
The deepest, most cushioning option for a near-home feel
All depths available in Medium, Firm, and Hard. For heavier builds, contact us and we'll recommend the right depth and firmness.
Care & Maintenance
Mattress
- You'll never have to turn it โ the sleeping side is marked
- Air it regularly, especially after damp trips; use a mattress protector
- The foam itself needs nothing doing to it
Zip-off cover
- Machine wash at 30ยฐC on a gentle cycle
- Mild liquid detergent โ no bleach
- Air dry only
- Iron on low if you need to
- Wash it every month or two
Measuring Guide
We cut the foam to the exact size you give us, and the cover then adds a few millimetres to the finished dimensions.
If your bed drops into a tight recess โ common on VW and coachbuilt conversions โ or you like room to tuck bedding in, take a little off your measurements. It's down to personal preference.
Delivery
- Free delivery to most addresses in England, Scotland, and Wales
- Rolled and vacuum-packed in a 158 ร 39 ร 39 cm box, so it comes through the door in one piece
Specific mattress weights are available on request.
Frequently Asked Questions
- How does Vascoยฎ memory foam work?
- It reacts to your body heat, softening and moulding to your shape so your weight spreads evenly and the pressure comes off your shoulders, hips and lower back โ the spots that ache most after a day out of the van.
- How good is the motion isolation?
- Very good. The Vascoยฎ foam soaks up movement rather than bouncing it across the bed, so a partner turning over or slipping out for an early start won't wake you โ which counts for a lot on a van-width bed.
- How long does a rolled mattress take to expand?
- Around 2โ4 hours to take shape; allow 24โ48 hours for the foam to fully activate and reach its proper feel.
- What's included?
- The mattress with its TENCELโข zip-off cover, care instructions, and a 5-year guarantee.
- Is the Firm option suitable for everyday use?
- Yes โ it's built for proper back and joint support but stays comfortable in every sleeping position, whether you're away for a weekend or living in the van full-time.
Would you rather talk it through with someone? Ring 0121 663 6114 โ MonโFri 10โ5, Sat 10โ2.