SKU:ComfiD105
Comfisan Left S Curve Campervan Mattress - Double
Couldn't load pickup availability

Multi-Layer Construction
Reflex-foam support that pushes back instead of swallowing you up — the answer for backs and joints that have had enough of a flat, unforgiving van bed.
-
Moisture-wicking cover, stitched in (TENCEL™)
A naturally hypoallergenic TENCEL™ cover that draws moisture away from the surface — worth its weight when condensation gathers in a closed-up van overnight. It's stitched permanently in place for a neat, seamless finish, with no zip to fray or work loose.
-
Springy top layer that pushes back (Vita Reflex™)
Softens the pressure points while keeping your spine in line, then recovers the instant you shift position — none of that slow, bogged-down feeling. Because it bounces back quicker than memory foam, rolling over on a narrow van bed stays effortless.
-
Firm base layer
A firm, dependable base built to keep its shape and spread support evenly from edge to edge, season after season of setting up and packing down.
Why Choose Comfisan™?
Hours behind the wheel, hauling gear in and out, and a fixed bed that was never designed with your spine in mind — it all adds up, and a thin, sagging van mattress is the last thing a sore back needs. The Comfisan™ is built the other way round, with support at its core. The Vita Reflex™ layer eases pressure points and holds your spine aligned, springing back as you turn rather than letting you bottom out, while the firm base beneath keeps that support steady right across the bed.
It's also one of the easier mattresses in the range to live with day to day — light to shift, single-sided so there's no flipping, and just as happy on a fixed van bed as on a slatted or adjustable base.
Ideal for:
- Anyone with a troublesome back or joints who needs firmer, supportive rest
- Sleepers who find memory foam too soft or too slow to bounce back
- People wanting responsive comfort that holds them up rather than letting them sink
- Vans with slatted or adjustable bases — the build flexes with the frame
Firmness & Depth Options
Firmness Levels
Solid support with just a hint of give
The firmer of the two, for anyone who wants a really solid feel
Available Depths
Slim, supportive fit for narrow recesses and shallow bed boxes
A well-judged depth that works in most campervan and coachbuilt beds
Our deepest build, for support closest to your bed back home
Every depth comes in Medium-firm or Hard. Carrying more weight? Get in touch and we'll point you to the right depth and firmness.
Care & Maintenance
Mattress
- No-flip build — sleep on the marked side only
- Let it air often and pair it with a mattress protector
- Hypoallergenic throughout, so it naturally resists dust mites
Fixed cover
- Spot clean using mild detergent and water
- Let it air dry fully before use
- A mattress protector helps keep it fresh between trips
- For a deeper clean, use a professional cleaning service
Measuring Guide
Send us your precise measurements and we make the core to suit; expect the finished mattress to gain a few millimetres once the cover is fitted.
Where a bed sits in a tight recess — think fixed coachbuilt layouts or a snug T5/T6 conversion — or you like extra room to tuck bedding under, take a little off your numbers. There's no right answer; it's whatever suits you.
Delivery
- Free delivery delivered free across mainland England, Scotland and Wales
- Rolled and vacuum-packed in a 158 × 39 × 39 cm box, so it comes through the door in one piece
Specific mattress weights are available on request.
Frequently Asked Questions
- Why does the Comfisan™ have a fixed cover?
- Stitching the cover in place gives a neater, seamless finish and stands up better to daily van life, with no zip to fail. Just spot clean it and use a mattress protector to keep it fresh.
- How long does a rolled mattress take to expand?
- Within an hour or two it is usually back to 95% of its shape and size, though it can sometimes take 24 hours or so to recover fully.
- What's included?
- You get the mattress with its TENCEL™ fixed cover, care instructions and a 5-year guarantee.
- Is it suitable for adjustable beds?
- Yes. It bends with an adjustable or slatted base without losing the firm support underneath you.
Would you rather talk it through with someone? Ring 0121 663 6114 — Mon–Fri 10–5, Sat 10–2.
Customer Reviews
Loading reviews...