10,000+ Mattresses Made Made to Your Exact Shape Free UK Delivery ★★★★★Excellent
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:ComfiSK105

Comfisan Left S Curve Campervan Mattress - Super King

Regular price ยฃ509.00 GBP
Regular price Sale Price ยฃ509.00 GBP
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit โ†’

Quick measuring reference

Place your order and send your measurements afterwards โ€” email us at hello@campervanmattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

Too complex to measure? We'll send you a free tracing kit โ€” craft paper, marker and a prepaid return envelope. Trace your shape and post it back โ€” we'll do the rest.

Sent once your mattress order is placed ยท Completely free ยท Posted out promptly

Vehicle Details

Optional but helpful โ€” the more detail you provide, the better we can match your mattress

Free UK delivery
England, Scotland & Wales
Made to your exact size
Cut to your measurements
Handmade in Britain
In our workshop since 1985
Guaranteed quality
Up to 10-year guarantee
View full details
Comfisanโ„ข Campervan Mattress lifestyle Multi-Layer Construction
Comfisanโ„ข construction cutaway Lifestyle

Reflex-foam support that pushes back instead of swallowing you up โ€” the answer for backs and joints that have had enough of a flat, unforgiving van bed.

  • 2 firmness levels: Medium-firm, Hard
  • Depths from 15โ€“25 cm
  • 5-year guarantee
  • Moisture-wicking cover, stitched in (TENCELโ„ข)
  • A springy top layer that pushes back as you move (Vita Reflexยฎ)
  • Bonded 2-layer construction โ€” not one slab of foam
  • You'll never have to turn it

Multi-Layer Construction

Comfisanโ„ข multi-layer construction diagram
  1. Moisture-wicking cover, stitched in (TENCELโ„ข)

    A naturally hypoallergenic TENCELโ„ข cover that draws moisture away from the surface โ€” worth its weight when condensation gathers in a closed-up van overnight. It's stitched permanently in place for a neat, seamless finish, with no zip to fray or work loose.

  2. Springy top layer that pushes back (Vita Reflexยฎ)

    Softens the pressure points while keeping your spine in line, then recovers the instant you shift position โ€” none of that slow, bogged-down feeling. Because it bounces back quicker than memory foam, rolling over on a narrow van bed stays effortless.

  3. Firm base layer

    A firm, dependable base built to keep its shape and spread support evenly from edge to edge, season after season of setting up and packing down.

Why Choose Comfisanโ„ข?

Hours behind the wheel, hauling gear in and out, and a fixed bed that was never designed with your spine in mind โ€” it all adds up, and a thin, sagging van mattress is the last thing a sore back needs. The Comfisanโ„ข is built the other way round, with support at its core. The Vita Reflexยฎ layer eases pressure points and holds your spine aligned, springing back as you turn rather than letting you bottom out, while the firm base beneath keeps that support steady right across the bed.

It's also one of the easier mattresses in the range to live with day to day โ€” light to shift, single-sided so there's no flipping, and just as happy on a fixed van bed as on a slatted or adjustable base.

Ideal for:

  • Anyone with a troublesome back or joints who needs firmer, supportive rest
  • Sleepers who find memory foam too soft or too slow to bounce back
  • People wanting responsive comfort that holds them up rather than letting them sink
  • Vans with slatted or adjustable bases โ€” the build flexes with the frame

Firmness & Depth Options

Firmness Levels

Medium-firm

Solid support with just a hint of give

Hard

The firmer of the two, for anyone who wants a really solid feel

Available Depths

15 cm

Slim, supportive fit for narrow recesses and shallow bed boxes

20 cm

A well-judged depth that works in most campervan and coachbuilt beds

25 cm

Our deepest build, for support closest to your bed back home

Every depth comes in Medium-firm or Hard. Carrying more weight? Get in touch and we'll point you to the right depth and firmness.

Care & Maintenance

Mattress

  • No-flip build โ€” sleep on the marked side only
  • Let it air often and pair it with a mattress protector
  • Hypoallergenic throughout, so it naturally resists dust mites

Fixed cover

  • Spot clean using mild detergent and water
  • Let it air dry fully before use
  • Add a mattress protector for extra care
  • Have it professionally cleaned if needed

Measuring Guide

Send us your precise measurements and we cut the core to suit; expect the finished mattress to gain a few millimetres once the cover is fitted.

Where a bed sits in a tight recess โ€” think fixed coachbuilt layouts or a snug T5/T6 conversion โ€” or you like extra room to tuck bedding under, take a little off your numbers. There's no right answer; it's whatever suits you.

Delivery

  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled and vacuum-packed in a 158 ร— 39 ร— 39 cm box, so it comes through the door in one piece

Specific mattress weights are available on request.

Frequently Asked Questions

Why does the Comfisanโ„ข have a fixed cover?
Stitching the cover in place gives a neater, seamless finish and stands up better to daily van life, with no zip to fail. Just spot clean it and use a mattress protector to keep it fresh.
How long does a rolled mattress take to expand?
Allow anything from an hour to a few hours for it to open out fully.
What's included?
You get the mattress with its TENCELโ„ข fixed cover, care instructions and a 5-year guarantee.
Is it suitable for adjustable beds?
Yes. It bends with an adjustable or slatted base without losing the firm support underneath you.
5-Year Guarantee Handmade in Britain to the size you give us

Would you rather talk it through with someone? Ring 0121 663 6114 โ€” Monโ€“Fri 10โ€“5, Sat 10โ€“2.