SKU:GrandSK136
Grand Crescent™ Right S Curve Luxury Campervan Mattress - Super King
Couldn't load pickup availability

Four Layer Construction
Deep memory foam that cradles your hips and shoulders, with the breathable foam sealed into the cover so the warmth of a shut-up van never gathers beneath you.
-
Cover that draws the heat away (Revo™)
The internet calls it cool gel, but there is no gel in it — it is a foam made with open cells, so it releases your body heat rather than bottling it up. The cooling here isn't a loose pad that goes missing: the foam is held between two layers of cover fabric, sewn round the edge and quilted in a wave pattern, so the cover and the cooling are one and the same piece, and it is the first thing you lie on after a long drive. Laboratory testing puts it at 30× more breathable than ordinary memory foam, so heat has nowhere to gather in a closed-up van. Hardly anyone makes a cover like it. When it needs freshening, unzip the cover and the breathable layer comes away with it.
-
Deep memory foam that moulds to you (Vasco™60)
Top-grade memory foam that warms and gives way beneath you, moulding around your shoulders, hips and the small of your back so pressure lifts off the points that ache after a day on your feet. It quietly swallows movement too, so a partner shifting beside you on a van bed barely registers.
-
Springy support layer that stops you sinking (Laytec™)
Under the deep foam sits a springy support layer that catches your weight and holds your back in line. That is why you can settle into the surface and still wake up supported, rather than sagging through to the base.
-
Firm base layer
A firm, breathable base that anchors the whole mattress and keeps its shape through years of use, yet stays light enough to shift and manoeuvre in the tight quarters of a van.
A hand was held on each foam, then lifted off. These are heat pictures of what it left behind — red is warm, blue is cool.
A minute on, the memory foam is still holding the heat. Ours has let it go. That is what we mean when we say it sleeps cooler. Heat pictures by The Vita Group, who make the foam for us.
Why Choose Grand Crescent?
Memory foam gives you that lovely sink-in, wrapped-up feeling — the catch is that it normally hangs onto your body heat, and a sealed van warms up fast. The Grand Crescent™ is our answer at the top of the range. The memory foam is genuinely deep, so you settle into it and it cushions every pressure point, while the support layer beneath keeps you held in place. And with that breathable foam built into the cover, none of that comfort arrives with the stuffiness memory foam usually brings.
It's for the owner who's put real money into their conversion and wants the bed to live up to the rest of it: four bonded layers, in our two deepest builds, with the foam standing behind an 8-year guarantee.
Ideal for:
- Van owners who love the hug of memory foam but overheat on it in a closed-up cabin
- Anyone after deep pressure relief that's still held up firmly from below
- Couples on a shared van bed — the foam soaks up movement, so you feel less of each other's turns
- Anyone kitting out a high-end conversion who simply wants the best mattress we make
Firmness & Depth Options
Firmness Levels
A gentler, sink-in feel with the cooling baked into the cover
Firmer, back-friendly support that still sleeps cool
Available Depths
The sweet spot of cushioning, support and cooling
Our deepest build, the closest your van gets to your bed at home
Both depths come in Medium and Firm. Carrying a bit more weight? Get in touch and we'll point you to the right depth and firmness.
Care & Maintenance
Mattress
- No turning needed — the top side is clearly marked
- Let it air when you can
Zip-off cover
- Dry clean only — don't put it in the machine
- Don't wash it by hand either
- No bleach, nothing harsh
- Never tumble dry it
Measuring Guide
We make the foam to the measurements you send us, and the cover then adds a couple of millimetres to the final size.
If your bed drops into a snug recess — as it often does in VW and coachbuilt conversions — or you want a little slack for tucking bedding in, trim your figures down a touch. That part's purely personal preference.
Delivery
- Free delivery delivered free across mainland England, Scotland and Wales
- Rolled and vacuum-packed in a 158 × 39 × 39 cm box, so it comes through the door in one piece
Specific mattress weights are available on request.
Frequently Asked Questions
- How do the memory foam and cooling work together?
- The foam moulds around you and lifts pressure off your joints, while the foam in the cover pulls warmth away from the surface — you get everything people love about memory foam without the heat it normally holds in a warm van.
- What do the four layers do?
- Top to bottom: a breathable cover to shed heat, deep memory foam for pressure relief, a responsive layer that pushes back and keeps your spine level, then a steady, breathable base so you don't sink.
- How long does a rolled mattress take to expand?
- Within an hour or two it is usually back to 95% of its shape and size, though it can sometimes take 24 hours or so to recover fully.
- What's included?
- The mattress itself, its zip-off cooling cover, your care instructions, and an 8-year guarantee covering the foam.
- Is the Firm option suitable for everyday use?
- Definitely — it's built to give back-and-joint support night after night while still sleeping cool, and it works whichever position you settle into.
Would you rather talk it through with someone? Ring 0121 663 6114 — Mon–Fri 10–5, Sat 10–2.
Customer Reviews
Loading reviews...