SKU:Imperial2000K105
Imperial Elite 2000 Left S Curve Campervan Mattress - King
Smooth or dimpled — a closer look
Couldn't load pickup availability

A true pocket-sprung bed cut to your van's dimensions โ 2000 individually wrapped springs beneath memory foam, cooling gel and a soft cashmere-blend cover, so the van bed finally matches the one at home.
- 2000 individually wrapped pocket springs
- 3 firmness levels: Medium, Firm, Hard
- One depth: 25 cm
- 10-year guarantee
- Soft cashmere-blend cover
- A cool-gel layer that carries the heat away (Revoยฎ)
- Memory foam that moulds to you (Vascoยฎ60)
- A firm edge you can sit on and push up from
Your Surface: Smooth or Dimpled?
Every Imperial Elite™ 2000 is tufted — the buttoning that sets the spring tension and locks the fillings in place. How we tuft depends on the firmness you choose, and it changes how the top of the mattress looks and feels:
Seven Layer Construction
-
Soft cashmere-blend cover
Beautifully soft to the touch and naturally hypoallergenic, with a smooth finish that holds its shape season after season.
-
Cool-gel layer that carries the heat away (Revoยฎ)
A foam with open cells that carries heat away from you, so the bed stays fresh instead of turning warm in a shut-up van.
-
Memory foam that moulds to you (Vascoยฎ60)
Top-grade memory foam that shapes around you for deep pressure relief and quietly soaks up movement, so a partner turning over on a narrow bed won't stir you.
-
Layer that blends the foam into the springs
Eases the soft comfort foams into the springs beneath, so the feel shifts gradually rather than all at once. Featured in the Firm and Hard variants.
-
Tufted construction
Ties the upper layers down to the springs and sets the tension. The Medium is half-tufted, so its surface stays smooth and even; the Firm and Hard are fully tufted, drawing the buttons right through for the traditional dimpled surface.
-
Two thousand pocket springs
Two thousand springs, each sealed in its own pocket and free to move alone, so the bed flexes to you and your partner independently โ responsive, properly supportive and breathable in a way a block of foam never manages.
-
A firm edge you can sit on
A stiffened border that keeps the edges from collapsing, so you can use every inch of the surface and perch or sleep right up to the side โ handy when floor space is tight in a van.
The Medium is the softer, more cushioned build โ half-tufted, which sets a gentler tension while keeping the surface smooth. The Firm and Hard are fully tufted, giving the traditional dimpled surface and firmer support.
Why Choose Imperial Eliteโข 2000?
Nearly every campervan mattress is all-foam. The Imperial Eliteโข 2000 breaks from that: at its core are 2000 individually wrapped pocket springs โ the sort you'd find in a proper high-end home bed โ which give it the responsive, breathable, genuine-mattress feel foam alone can't reach. Over the springs, memory foam moulds to you and a cool-gel layer keeps things fresh, all wrapped in a soft cashmere-blend cover.
Since each spring works on its own, the support shapes itself to your body and any movement stays on your side of the bed โ something couples sharing a snug van bed will appreciate. The reinforced edge keeps it firm and true for years. It really is as close as a van bed gets to your mattress at home.
Ideal for:
- Anyone who wants the van bed to feel like the one at home
- Couples on a shared bed โ the independent springs stop movement travelling across
- Sleepers who prefer the airy, springy response of pocket springs to solid foam
- Anyone who needs a firm edge to sit on and push up from
Firmness Options
Soft, cushioned comfort with cashmere gentleness up top
More support underneath, still cushioned on top
Our firmest, most solidly supportive choice
Every firmness is built to the same 25 cm depth.
Care & Maintenance
Mattress
- You'll never have to turn it โ the sleeping side is marked
- The springs need nothing doing to them
- The firm edge stays firm โ it won't collapse with use
Cashmere-Blend Cover
- Sponge small marks off with mild detergent
- It holds its shape rather than going baggy
- Kind to the skin, and it resists dust mites
Measuring Guide
We cut the foam to the exact measurements you give us, and the cover then adds a couple of millimetres to the finished size.
If your bed sits in a tight recess โ as it often does in VW and coachbuilt conversions โ or you'd like a little room to tuck bedding in, take a fraction off your figures. It comes down to what you prefer.
Delivery
- Free delivery to most addresses in England, Scotland, and Wales
- Rolled & Boxed: vacuum-sealed in a 158 ร 60 ร 60 cm carton
Frequently Asked Questions
- What makes this the top of the range?
- It's the only pocket-sprung hybrid we make โ 2000 wrapped springs paired with memory foam, a cool-gel layer and a cashmere-blend cover in a multi-layer build. Nothing else in our range sleeps like it.
- How do 2000 pocket springs improve comfort?
- Because every spring moves by itself, the support moulds to your shape and one person's movement doesn't roll across to the other โ a genuine plus for couples on a shared van bed.
- What is the cashmere-blend cover like?
- Smooth, naturally soft and hypoallergenic. On the Medium it's half-tufted for a smooth finish; on the Firm and Hard it's fully tufted, with the traditional dimpled surface โ and it keeps looking and feeling good for years.
- How long does a rolled mattress take to expand?
- Around 2โ4 hours to open out โ the pocket springs bounce back straight away โ with a further 24โ48 hours to settle completely.
- What's included?
- Everything arrives together: the mattress, its cashmere-blend cover, a care sheet, and your 10-year guarantee.
- Is this your most supportive mattress?
- Yes โ the 2000 pocket-spring system is the strongest, most supportive build we offer. Tell us your requirements and we'll steer you to the right option.
Would you rather talk it through with someone? Ring 0121 663 6114 โ MonโFri 10โ5, Sat 10โ2.