✓10,000+ Mattresses Made ✓Cover included, never bare foam ✓Free UK Delivery ✓★★★★★Excellent
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:NovoSK105

Novolatex Left S Curve Campervan Mattress - Super King

Regular price £609.00 GBP
Regular price Sale Price £609.00 GBP
Sale Sold out
Translation missing: en.products.product.taxes_included
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit →

Quick measuring reference

Place your order and send your measurements afterwards — email us at hello@campervanmattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit — craft paper, marker and a prepaid return envelope. Trace your shape and post it back — we'll do the rest.

Sent once your mattress order is placed · Completely free · Posted out promptly

Vehicle Details

Optional but helpful — the more detail you provide, the better we can match your mattress

Free UK delivery
England, Scotland & Wales
Made to your size
Cut to your measurements
Handmade in Britain
Made to order, by hand
Guaranteed quality
Up to 10-year guarantee
View full details
Novolatex™ construction cutaway Lifestyle

Triple Layer Construction

The lively, latex-like feel — Laytec™ foam springs back with you so you rest on top of the bed rather than sinking into it, night after night in the van.

Novolatex™ triple-layer construction diagram
  1. Deep, soft quilted zip-off cover (Cloud™)

    A deep, soft quilted cover that is kind to the skin and shrugs off dust and damp. It unzips in seconds and goes straight in the machine, so there's no lugging the mattress out of the van to freshen it.

  2. Springy top layer that pushes back (Laytec™)

    Cradles your pressure points then rebounds instantly as you shift — the responsive, latex-like bounce of Laytec™ instead of the slow sink of memory foam, so rolling over on a narrow van bed feels effortless and you're never pinned in place.

  3. Firm lower layer that holds you up

    Works below the comfort layer to hold your spine level and stop you dropping too deep, partnering the Laytec™ foam to strike the balance between spring and steady support.

  4. Firm base layer

    A solid, long-lasting base that keeps the mattress true to shape season after season — light enough to lift or stow away when the van's space is tight.

Why Choose Novolatex™?

If the sunken, "stuck in the bed" feeling of memory foam isn't for you, the Novolatex™ is the answer. Its Laytec™ comfort layer is springy and buoyant — engineered to feel like natural latex, it cushions your pressure points but pushes back the instant you move, so you lie on top of the mattress rather than in a dip. That makes it a firm favourite with restless sleepers who shift about all night, and with anyone who simply wants a livelier, more responsive bed.

Because the foam is open-structured and responsive rather than dense, it breathes far more freely than memory foam — a real bonus in a shut-up van, where it won't trap heat and clamminess the way solid foam does. Under the comfort layer, an adaptive support layer keeps your spine aligned right across the bed.

Ideal for:

  • Anyone who can't settle on the sinking, slow-to-recover feel of memory foam
  • Restless sleepers who twist and turn on a narrow van bed all night
  • Those after a springier, latex-like bounce with plenty of life
  • Van sleepers after firm support with a lively, springy feel

Firmness & Depth Options

Firmness Levels

Medium

A gentler, lightly contouring feel

Firm

Extra support below, still lively on top

Hard

The firmest support, still with a lively rebound

Available Depths

15 cm

Slimline, responsive comfort for shallow bed boxes and pop-tops

20 cm

A middle-ground depth that fits most campervan and motorhome beds

25 cm

Our deepest build, for the full triple-layer feel

Every depth comes in Medium, Firm and Hard. Carrying a heavier build? Get in touch and we'll point you to the right depth and firmness.

Care & Maintenance

Mattress

  • No turning needed — the top side is clearly marked
  • Laytec™ foam keeps its bounce back with minimal maintenance
  • The foam resists dust mites

Zip-off cover

  • Machine wash at 30°C on a gentle cycle
  • Mild liquid detergent — no bleach
  • Air dry only
  • Iron on low if you need to
  • Wash it every month or two

Measuring Guide

Every mattress is made to the precise dimensions you give us; the cover then adds a small amount to the finished size.

Where the bed sits in a tight recess — as it often does in VW and coachbuilt conversions — or you like a little room to tuck bedding in, trim your measurements down slightly. That part is purely personal preference.

Delivery

  • Free delivery delivered free across mainland England, Scotland and Wales
  • Rolled and vacuum-packed in a 158 × 39 × 39 cm box, so it comes through the door in one piece

Specific mattress weights are available on request.

Frequently Asked Questions

How does Laytec™ work?
It's a responsive comfort foam that recovers far quicker than memory foam, giving a springy, latex-like bounce back while still cushioning your pressure points.
What's the benefit of that springy feel?
You turn over and change position far more freely, and the bed feels lively rather than sluggish — handy on a snug van bed. The open-structured foam also tends not to trap heat the way dense memory foam does.
How long does a rolled mattress take to expand?
Within an hour or two it is usually back to 95% of its shape and size, though it can sometimes take 24 hours or so to recover fully.
What's included?
The mattress, its Cloud™ zip-off cover, care instructions and a 6-year guarantee.
Is the Firm option suitable for everyday use?
Yes. Firm gives you more support underneath while the top layer still cushions and springs back, on weekend trips or full-time van life alike.
6-Year Guarantee Made by hand in Britain, to your van's measurements

Would you rather talk it through with someone? Ring 0121 663 6114 — Mon–Fri 10–5, Sat 10–2.